In November 2019, a new canopy roof of approximately 8,000sqm was installed to provide full cover for the tennis court and improve conditions for both players and spectators. The roof needed to be installed in time for the inaugural 2020 ATP Cup.

The construction of the roof required the installation of air circulation fans for natural ventilation air movement for tennis mode operations during summer months, as well as complying with the provisional capacity for cooling to the courts for netball mode, all within a 3-week program.

Additionally, the roof was fully prefabricated beforehand therefore all the trades were required to collaborate and coordinate common fixing points before construction.

Builder:
AW Edwards

Consultant:
Arup

Contract:
Construct only above Location

Location:
2 Rod Laver Dr, Sydney Olympic Park NSW 2127

Value of Project:
$2.2M

Timeframe:
2020

Builder:
AW Edwards

Consultant:
Arup

Contract:
Construct only above Location

Location:
2 Rod Laver Dr, Sydney Olympic Park NSW 2127

Value of Project:
$2.2M

Timeframe:
2020

PJS Air scope of works for thIS project

Australia Post

INSTALLING

  • 74 high-level Arius impulse jet fans, specifically engineered and manufactured in the USA based on compound fluid dynamics calculations for optimum air movement
  • air-conditioning systems for 5 comms rooms
  • ventilation services to amenities including general and toilet exhaust systems
  • a fully integrated building management system (BMS) to interface with all services
Provisioning plenums and long-throw diffusers for the connection of temporary HVAC plant when required.
Australia Post

INSTALLING

  • 74 high-level Arius impulse jet fans, specifically engineered and manufactured in the USA based on compound fluid dynamics calculations for optimum air movement
  • air-conditioning systems for 5 comms rooms
  • ventilation services to amenities including general and toilet exhaust systems
  • a fully integrated building management system (BMS) to interface with all services

Provisioning plenums and long-throw diffusers for the connection of temporary HVAC plant when required.

OUTCOMES

 Nil LTI’s.
Completed on time and on budget.