54 Miller st, north sydney

54 Miller St

description of project

The building’s mechanical fire systems needed to be upgraded to meet the current essential services BCA requirements.

This included a building compliance upgrade to the smoke handling systems of the 13-storey building, demanding the installation of floor-by-floor differential pressure and smoke control.

Builder:
Renascent Australia Pty Ltd

Consultant:
VOS Group

Contract:
Design and Construct

Location:
54 Miller St, North Sydney NSW 2060

Value of Project:
$1.2M

Timeframe:
2020

Builder:
Renascent Australia Pty Ltd

Consultant:
VOS Group

Contract:
Design and Construct

Location:
54 Miller St, North Sydney NSW 2060

Value of Project:
$1.2M

Timeframe:
2020

PJS Air scope of works for thIS project

54 Miller St

INSTALLING

  • 5 stair pressurisation fans
  • 1 new smoke exhaust fan
  • all cold shell fitouts for retail area
  • 1 lift-shaft pressurisation fan
  • new external riser shafts rising 13 floors
  • floor-by-floor differential pressure control
  • 13 new smoke exhaust subducts and pressure- controlled motorised dampers on each floor
  • air-conditioning and a bathroom exhaust system in the new end-of-trip facility
  • ducted air-conditioning on the ground floor to serve the lobby and retail tenancies
  • the alteration of toilet exhaust systems to accommodate the smoke- handling scheme
54 Miller St

INSTALLING

  • 5 stair pressurisation fans
  • 1 new smoke exhaust fan
  • all cold shell fitouts for retail area
  • 1 lift-shaft pressurisation fan
  • new external riser shafts rising 13 floors
  • floor-by-floor differential pressure control
  • 13 new smoke exhaust subducts and pressure- controlled motorised dampers on each floor
  • air-conditioning and a bathroom exhaust system in the new end-of-trip facility
  • ducted air-conditioning on the ground floor to serve the lobby and retail tenancies
  • the alteration of toilet exhaust systems to accommodate the smoke- handling scheme

OUTCOMES

Nil LTI’s.
Delivered on time and on budget.
The team has installed a practical mechanical fire system which complies with BCA requirements.